02 · Bid

The bid leveling sheet that fills itself in

Subcontractors get your invitation to bid by email and price your line items online, with or without an account. Every number lands in the bid tab, including the ones from a quote sent as a PDF.

Three subcontractors in columns on the same bid form, every price read against your estimate, with questions and alternates on the line they concern. Sample project.

Invitations to bid, sent in a few clicks

Pick the trade packages, the subcontractors and the bid due date: each one gets a link by email and prices your line items online, with or without a Raygister account.

  • Trade packages, recipients, message and bid due date go out in one send, from the project.
  • Each subcontractor accepts or declines package by package, then prices your line items online, no account required.
  • Invited, bid received, declined: coverage is tracked per trade package, and a reminder goes out in one click.

Bid leveling line by line, always current

Every bid becomes a column on your bid form. Prices, lead times and gaps against your estimate read on the line, with no spreadsheet to rebuild.

  • Every price reads against your estimate, and the low bid stands out on each line item and on the total.
  • Alternates, exclusions and lines a subcontractor added stay visible, apart from your line items.
  • Request a revised bid on the lines in question, then compare both versions line by line.

Quotes sent by email join the bid tab

A subcontractor would rather send its usual quote? It replies to the invitation with the file attached: Raygister reads the quote and files it in that subcontractor's column.

  • PDF, Excel or a photo: the subcontractor replies to the invitation with its quote attached, or you drop the file in yourself.
  • Each line is read and matched to your line items; lines outside your bid form stay listed apart.
  • Uncertain matches are flagged in the grid: approve them one by one or all at once.

Frequently asked questions

What is bid leveling?

Bid leveling means putting subcontractor bids on a common basis so they compare apples to apples: same scope, same line items, same quantities, with exclusions and alternates called out. In Raygister every bid is a column on your bid form, so the bid tabulation is leveled as the numbers come in.

How do I send an invitation to bid to subcontractors?

Pick the trade packages, the subcontractors and the bid due date, add a message, and send. Each subcontractor gets a link by email to the line items to price, and you track who was invited, who bid and who declined for each package.

Do subcontractors need an account to bid?

No. A subcontractor can bid from the link in the invitation without an account, or reply with its quote attached. If it signs up later, it finds its bid in its account.

Can a subcontractor see the other bids?

No. A bidder never sees the names, the number, the prices or the questions of the others. When you send a clarification to every bidder on a package, it goes out without naming who asked.

What happens when a subcontractor emails a PDF quote instead of bidding online?

The quote still joins the bid tab. The subcontractor replies to the invitation with the file attached (PDF, Excel or a photo), or you drop it in yourself. Raygister reads the lines, matches them to your line items and flags the ones worth a second look.

Can I change the bid documents or ask for a revised bid after bids come in?

Yes. A change to the specifications is published to the subcontractors that accepted the package. You can also request a revision on the lines in question: every submission freezes a numbered version of the bid, which you compare with the one before.

From specs to signed subcontracts, in one place

Ready to transform your projects?

Create your account and launch your first project.