01 · Describe

Your estimate, from drawings to bid form and scope of work

Upload drawings, project notes or a spreadsheet: the assistant drafts trade packages, line items, quantities and unit costs, and you review line by line. The same specifications then produce the bid form, the scope of work and your invitations to bid, with nothing entered twice.

With the drawings, project notes and photos uploaded, the specifications are drafted package by package: quantities, unit prices, tax and standards. Sample project.

A line-item estimate, trade package by trade package

The assistant reads your drawings, project notes, spreadsheets and photos, then drafts the trade packages and line items across every trade. Every line stays yours to edit.

  • Each line item carries its description, quantity, unit, unit cost and tax, and totals roll up by trade package.
  • Review and correct line by line, the way you would in a spreadsheet: nothing goes out to subcontractors without your approval.
  • Line items you already keep in Excel import from a spreadsheet template, and versions of the specifications save on their own.

Locations: the estimate, room by room

Levels and rooms organize the project the way your drawings do. Every line item is tied to its locations, and breaks down room by room when the owner asks for it.

  • The assistant creates levels and rooms from your drawings, and you set their floor area.
  • Split by location turns one line item into one line per room: quantities are shared by floor area and the package total does not move.
  • Filter and sort the specifications by location, and the bid form lists the rooms of every line.

Bid form and scope of work, generated from the estimate

Stop writing bid documents on the side: the bid form and the scope of work come out of the specifications, at the version you pick.

  • The bid form exports to Excel or PDF with no prices: subcontractors fill it in, and Raygister reads their completed file back.
  • The estimate, kept confidential, carries your unit costs, tax by rate and your fees.
  • The scope of work is assembled as a PDF from each line item's description, for the trade packages you choose, with no prices.

Line items backed by building standards

Every line item cites the standards that govern its installation, for a scope of work that holds up and an estimate you can defend. Today the list covers French standards (DTU, NF and NF EN).

  • The assistant ties each line item to the standards that apply to it, from more than 200 references sorted by trade.
  • Standards sit on the line item's sheet, next to its description: you check them before going out to bid.
  • Suggested unit costs draw on your documents and the type of project, and stay editable line by line.

Your library of work items, unit costs and products

Write once what you specify on every job: your trade packages, your work items with their description, reference price and standards, and the products you call for.

  • A trade package or work item from the library lands in the project as a copy: its origin stays visible and your library does not change.
  • A well-written line item from a project goes into the library in one step, with its price.
  • Import your existing price list from Excel or CSV, and every product keeps its brand, its reference and the link to its product page.

Frequently asked questions

What is the difference between an estimate, a bid form and a scope of work?

The estimate is the priced, line-item breakdown of the job, trade package by trade package. The bid form is the same breakdown with the prices left blank, for each subcontractor to fill in. The scope of work is the written description of what each line item requires, with no prices. In Raygister you write the specifications once and all three come from them.

Can I build an estimate from a set of drawings?

Yes. Upload PDF drawings, project notes, spreadsheets, photos or an IFC model, and the assistant drafts the trade packages, line items, locations and quantities. Every suggestion can be reviewed and corrected line by line: the review stays yours.

Where do the unit costs come from?

Raygister does not lock you into a cost database. The assistant suggests a unit cost for each line item from your documents, the type of project and the level of finish, and reference prices from your own library carry over as they are. Every price is editable, and the bids you receive then show what the market actually charges.

Can I bring in my existing estimates and price lists?

Yes. Spreadsheet lines import into a project from an Excel or CSV template, and the assistant can read a past estimate or scope of work to reuse its line items. Work items and products import into the library the same way.

Which building standards does it cite?

Today the assistant cites French standards (DTU, NF and NF EN) from a list of more than 200 references that Raygister maintains by trade. The list does not replace the standards themselves or your own code review: as with prices, you check a line item's standards before going out to bid.

Can several people work on the same estimate?

Yes. Edits show up live for everyone on the team, each line item has its comments and its status (draft, pending approval, in progress, done), and versions of the project save on their own.

From specs to signed subcontracts, in one place

Ready to transform your projects?

Create your account and launch your first project.