03 · Decide

From leveled bids to an award recommendation, numbers in hand

Line up subcontractor scenarios by trade package against your estimate and the owner's budget. The owner reads the comparison online, no account needed, and every version of the estimate stays frozen to show what moved.

Two subcontractor scenarios side by side, package by package, their gap to the owner's budget and the presentation shared as a link. Sample project.

Scenario comparison and owner presentation

A comparison puts your scenarios in columns: one subcontractor per trade package, the total, the variance to budget. The owner reads it online or as a PDF.

  • For each trade package, carry a subcontractor's bid, your own estimate, the budget or a plug number.
  • Variances read against a reference column and the owner's budget, and you flag the scenario you recommend.
  • The owner opens the comparison from a link, no account needed, or gets the PDF, and you see how many times it was viewed.

Estimate and scope of work versions

V1 at bid documents, V2 after bidding: each version freezes the trade packages, line items and fees, and compares with the next line by line.

  • Save a version in one click, with a label and a note, and Raygister saves one on its own after you make changes.
  • Two versions side by side: line items changed, added or missing, with the variance in quantity, price and total.
  • From any version, generate the estimate or the scope of work, or restore it to the project.

Frequently asked questions

How do you present a bid comparison to the owner?

In Raygister, leveled bids become a comparison: one column per scenario, one row per trade package, the subcontractor you carry and its number in each cell. Variances read against a reference column and the project budget, and you flag the column you recommend. Present it full screen in the meeting, or send the owner a link or a PDF.

Is the low bid always the one to recommend?

No. The low bid is the cheapest number; the best value is the bid that covers the scope, meets the schedule and comes from a subcontractor you trust. Put a low-bid scenario next to the one you recommend: the variance reads package by package, and the comparison's description tells the owner why.

Does the owner need an account to read the comparison?

No. The owner opens a link, with no account and no password, and sees only the subcontractors your scenarios carry, never your internal memo or the trade packages you hid. The link has an expiration date you can extend or turn off at any time, and you see how many times the comparison was viewed.

Can I compare value engineering options?

Yes, as columns of one comparison. In each column, carry a different subcontractor on a trade package, use your own estimate or the budget, plug a number, or leave the package out. The total and the variance to the reference column follow, so the owner sees what each option saves.

Why freeze versions of the estimate?

To know what was priced, and when. A version locks the project's trade packages, line items and fees: its numbers never move again. V1 at bid documents, V2 after bidding: compare them line by line, generate the estimate or the scope of work from either one, and restore a version if you need to go back.

Which formats can I export a comparison to?

PDF for the owner, Excel or CSV to rework the numbers. The PDF shows what the shared page shows: the columns, the trade packages, the totals and the variance to budget.